View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0000044 | Inlyra Studio | Performance | public | 2026-09-26 22:21 | 2026-09-26 22:22 |
| Reporter | inlyradev | Assigned To | inlyradev | ||
| Priority | normal | Severity | minor | Reproducibility | always |
| Status | resolved | Resolution | fixed | ||
| Target Version | v1.0.0 | ||||
| Summary | 0000044: Parallel workflow branch execution implemented and validated | ||||
| Description | Updated workflow execution so independent nodes/branches can run concurrently instead of waiting for unrelated nodes earlier in the execution plan. Each node now waits only for its actual upstream dependencies before becoming eligible to run. Parallel execution is bounded to avoid overwhelming the local machine or external databases. Active node executors are limited based on processor count, with a minimum of 2 and maximum of 8 concurrent executions. Dependency behavior is preserved: - downstream nodes wait for all required predecessors - failed branches block only their dependent nodes - unrelated branches continue executing - cancellation behavior remains supported - execution events remain ordered - node execution results and exceptions are stored using thread-safe collections Regression coverage was added for: - independent inputs executing simultaneously - Join waiting until both input branches are complete - failure isolation between independent branches - dependency barriers - ordered execution events - thread-safe/order-independent tests | ||||
| Additional Information | Manual performance comparison showed approximately: - Sequential execution: ~22 seconds - Parallel execution: ~15 seconds This represents approximately a 32% reduction in runtime for the tested workflow. Testing was performed by switching between the pre-parallelization master build and the parallel branch build to compare the same workflow under both execution models. GitHub: PR 0000010 — Run independent workflow branches in parallel Merged to master on Sep. 26, 2026. Result: Resolved / implemented successfully. Independent workflow branches now execute in parallel while preserving workflow dependency ordering and failure behavior. | ||||
| Tags | No tags attached. | ||||
| Report Type | Enhancement | ||||
| Edition | Both | ||||
| Operating System | Windows 11 | ||||
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2026-09-26 22:21 | inlyradev | New Issue | |
| 2026-09-26 22:21 | inlyradev | Status | new => assigned |
| 2026-09-26 22:21 | inlyradev | Assigned To | => inlyradev |
| 2026-09-26 22:22 | inlyradev | Status | assigned => resolved |
| 2026-09-26 22:22 | inlyradev | Resolution | open => fixed |
| 2026-09-26 22:22 | inlyradev | Note Added: 0000011 |